July 30, 2020
–
Brucejack Mine
THE PROJECT
Our Inspectors are still going strong with Pacific Gas & Electric (PG&E). We are currently inspecting both distribution and transmission power lines in Northern and Central California. We have over 100 distribution inspectors and almost 50 transmission inspectors. Our lineman are surveying the quality of electrical structures and equipment to determine any corrective action needed. This work is critical for proactively identifying hazards in high fire risk areas which is a top priority for our client in California.
You must be logged in to post a comment.