RP ILM

Rokstad Power linemen at work installing the high-voltage Interior-Lower Mainland transmission line, a 247-kilometre-long upgrade to the provincial power grid.

Original size is 1500 × 500 pixels

Rokstad Power linemen at work installing the high-voltage Interior-Lower Mainland transmission line, a 247-kilometre-long upgrade to the provincial power grid.