Filter By Date Filter By Date Select Year 2021 2020 2019 2017 Filter By CategoryFilter By Category Select Category Substation Distribution Transmission Underground Outage Response Live Line Search for: Ongoing Distribution, Transmission and Trouble Line services – BC Hydro Rokstad Power was awarded a significant portion of the work under the ROC 2.0 (Ongoing Distribution, Transmission and Trouble Line services) Program. Read more → Brucejack Transmission Line Rokstad Power was contracted to construct an approximately 35 mile long 138 kV Overhead Transmission Line for the Brucejack Mine, near Stewart, BC (Canada). Read more → Long Lake Hydro Transmission Line Project Rokstad Power was selected by Long Lake Hydro Inc. to complete the procurement and construction of a new 6.2 mile long 138 kV Transmission Line near Stewart, BC (Canada). Read more → Boone Area Reinforcement Project This project includes a rebuild of the existing Boone - Ward Hollow 46 kV Circuit and Boone - Cabin Creek 46 kV Circuit to 69 kV standards. It adds an additional 138 kV circuit from Boone Station, and tie into the Cabin Creek – Hernshaw 138 kV Circuit. Read more → 60L129 Circuit Uprating Rokstad Power was contracted to complete work on BC Hydro circuit 60L129 in order to upgrade the line rating. Read more → Western Alberta Transmission Line This project included the construction of a 500 kV High Voltage Direct Current (HVDC) transmission line approximately 100 miles long. Read more → Load more Get in touch to learn more Click Here