April 11, 2019
–
Brucejack Mine
THE PROJECT
Rokstad Power was selected by BC Hydro to take more than 1/2 mile of XLPE / PILC standby circuit and re-sectionalize to allow for redundancy and reliability. Rokstad Power’s crews were responsible for confirming the designer’s specification by conducting manhole inspections. It was expected that manhole & duct bank rehabilitations were required due to the age of the infrastructure within this area.