![](https://i0.wp.com/rokstadpower.com/wp-content/uploads/2019/04/Horsey-1.jpg?resize=479%2C406&ssl=1)
April 11, 2019
–
Brucejack Mine
THE PROJECT
Rokstad Power was selected by BC Hydro to install a new feeder circuit out of the Horsey Sub-Station. The work included in this project consisted of cable pulling, splicing, terminations, testing and PILC repairs.