
April 11, 2019
–
Brucejack Mine
THE PROJECT
Rokstad Power was selected by ILJIN Electric to complete the cable installation for the Underground work required at the Henrietta Substation in New York. This included the following:
- Installation of two circuits of 345kV XLPE cable and assistance with termination of 12 outdoor sealing ends.
- Construction and dismantling of four scaffolding structures with protection against inclement weather conditions.
- Assistance with testing and commissioning and energization of cable circuit.
LOCATION: Rochester, NY
CLIENT: Avangrid - ILJIN Electric Company
COMPLETION DATE: April 2017
CATEGORY: Underground

You must be logged in to post a comment.