Filter By Date Filter By Date Select Year 2021 2020 2019 2017 Filter By CategoryFilter By Category Select Category Substation Distribution Transmission Underground Outage Response Live Line Search for: 60L129 Circuit Uprating Rokstad Power was contracted to complete work on BC Hydro circuit 60L129 in order to upgrade the line rating. Read more → 138 kV Live Line Work – Nova Scotia Rokstad Power was contracted to perform various live line work on circuit 6515, a 138 kV line running from Antigonish to Port Hawkesbury in Nova Scotia (Canada). Read more → Massachusetts Snow Storm In early April 2016, several areas of Massachusetts were hit with a spring snow storm that brought 4 to 6 inches of heavy wet snow and ice. Read more → 345 kV XLPE Cable Installation – Henrietta Substation Rokstad Power was selected by ILJIN Electric to complete the cable installation for the Underground work required at the Henrietta Substation in New York. Read more → Horsey (HSY) Substation Feeder Cable Project Rokstad Power was selected by BC Hydro to install a new feeder circuit out of the Horsey Sub-Station. Read more → Bipole I & II Spacer Damper Replacement Rokstad Power was selected by Manitoba Hydro to conduct the removal and disposal and installation of 61,250 new spacer dampers on the existing Bipole I & II 500 kV HVDC Transmission Line under live line conditions. Read more → Load more Get in touch to learn more Click Here