Brucejack Mine

LOCATION: Saskatoon, SK
CLIENT: SaskPower
COMPLETION DATE: May 2017
CATEGORY: Transmission

Rokstad Power was selected to complete the replacement of the existing 72kV existing WL7–HTF transmission line. The line is located 100km east of Saskatoon running parallel to HWY 2.  Roughly 280 wood pole H-frame structures will be replaced under energized conditions. A combination of direct embedment and Screw Barrel Foundations will be utilized. Lastly, existing overhead shield wire will be replaced with 5/16” galvanized steel shield wire on every structure.