Massachusetts Snow Storm In early April 2016, several areas of Massachusetts were hit with a spring snow storm that brought 4 to 6 inches of heavy wet snow and ice. Read more → Hurricane Irma, Florida In September 2017, Rokstad Power was called out to provide storm response in Southwest Florida. Read more → PG&E – Master Services Agreement Rokstad Power was selected by Pacific Gas & Electric to provide Transmission & Distribution construction and maintenance services for their Northwest Humboldt region. Read more → Ongoing Distribution, Transmission and Trouble Line services – BC Hydro Rokstad Power was awarded a significant portion of the work under the ROC 2.0 (Ongoing Distribution, Transmission and Trouble Line services) Program. Read more → Boone Area Reinforcement Project This project includes a rebuild of the existing Boone - Ward Hollow 46 kV Circuit and Boone - Cabin Creek 46 kV Circuit to 69 kV standards. It adds an additional 138 kV circuit from Boone Station, and tie into the Cabin Creek – Hernshaw 138 kV Circuit. Read more → Blackie Area 138kV Transmission Project Rokstad Power was contracted to complete 15 miles of new double circuit 138kV steel monopole transmission line between the Black 253S Substation and the Queenstown 504S substation east of Calgary (Canada). Read more → Interior to Lower Mainland Project This project consisted of the construction of a new 155 miles of single circuit 4 bundle 500 kV Lattice Steel Transmission Line between two existing BC Hydro substations. Read more → Hoopes – Willis 69kV Line Project Rokstad Power was awarded to construct approximately 5.4 miles of new single circuit Hoopes to Willis 69kV overhead electric transmission line between Buyer’s Hoopes substation and Willis substation in Chandler, AZ. Read more → Long Lake Hydro Transmission Line Project Rokstad Power was selected by Long Lake Hydro Inc. to complete the procurement and construction of a new 6.2 mile long 138 kV Transmission Line near Stewart, BC (Canada). Read more → Brucejack Transmission Line Rokstad Power was contracted to construct an approximately 35 mile long 138 kV Overhead Transmission Line for the Brucejack Mine, near Stewart, BC (Canada). Read more → Page 3 of 3Prev 1 2 3