Brucejack Mine
CANA -1

LOCATION: Lethbridge, AB
CLIENT: CANA High Voltage
COMPLETION DATE: December 2018
CATEGORY: Distribution

Rokstad Power was contracted to complete modifications to existing line structures that were required on the existing single circuit 138kV 824L transmission line from 593s Lakeview substation to 618s Riverbend substation in Lethbridge, Albert.  These included:

   Conversion of 2 existing structures from guyed wood pole structures to free-standing tubular steel dead end structures supported on cast in place concrete foundations,
   Moving 3 existing wood pole structures,
   Installation of temporary wood poles and anchors, conductor stub-down, OPGW re-route and transfer of wires on the existing line.