Filter By Date Filter By Date Select Year 2020 2019 2017 Filter By CategoryFilter By Category Select Category Distribution Transmission Underground Outage Response Live Line Search for: Rapid Earth Fault Current Limiter (REFCL) Project Rokstad was awarded a pilot project to install 13 Capacitive Balancing Units (CBUs) and perform 45 other work orders (reconductoring, underground work, Viper switches, regulators and minor circuit arrangements) to support the CBUs. Read more → Fire Restoration Work In 2020, California set a record for most acres burned in a single year, eclipsing 4 million. Rokstad was tasked with securing numerous crews and tools, mobilizing to the affected areas, and restoring the grid to working order. Read more → PSPS (Public Safety Power Shutdown) Patrol Work Due to the high potential for wildfires in California, PG&E has been proactively shutting down power during high-wind events. Rokstad has logged over 8,000 man hours on PSPS Patrol Work in 2020. Read more → PG&E – Inspection Work We are currently inspecting both distribution and transmission power lines in Northern and Central California. Read more → Western Canada Streetlight Replacement Our Western Canada Division just signed a new contract with BC Hydro to replace approximately 16, 400 streetlights in the Southern Interior of the province. The work will commence in September of this year and conclude by the end of 2023. Read more → SCE – 55kV Rebuild The project includes setting new steel poles in place of the existing wood structures and reconductoring both circuits installing 336 ACSR conductor. Read more → Load more Get in touch to learn more Click Here