Rokstad Power was selected for the replacement of SaskPower’s existing 72 kV WL7–HTF transmission line in November 2015. Roughly 280 wood pole H-frame structures will be replaced under energized conditions. A combination of direct embedment and screw barrel foundations will be utilized. Lastly, existing overhead shield wire will be replaced with 5/16” galvanized steel shield wire on every structure.